Methods for installing beacons under plaster, recommendations and steps


Plastering surfaces is required to make them look smooth and the room to look neat. The work is greatly facilitated by auxiliary material such as plaster beacons. This is a long strip attached to the wall. The top edge of the product sets the level of alignment.

Installing plastering beacons provides a number of benefits for the worker:

  • A smooth surface for finishing that cannot be obtained by other means.
  • Reducing work time.
  • Plastering using beacons can be performed by people with little or no relevant experience.
  • Reduced material consumption and reduced work costs.

The process of plastering walls.

In cases of a large layer of plaster, which reaches about 15 mm, it is necessary to divide all the work into 2 stages. First you need to apply the solution to the surface and level it so that it does not touch the beacons. The distance between them should be approximately 10 mm. After the initial layer of plaster has completely dried, you can proceed to further stages of work. It is necessary to apply the solution with a reserve, then it needs to be leveled with a rule that will come into contact with the beacon profile. The rule needs to be directed from the bottom to the very top, sometimes it needs to be swung in different directions. You cannot tear it off the surface. This can lead to an uneven surface in the future. When the main part of the mortar has dried, you can begin to level the angles between the floor and ceiling in relation to the wall. This leveling takes place using a trowel, with which you can easily work in hard-to-reach places, such as corners. Only after the entire surface of the wall has completely dried can the beacons be removed. Defects that may remain after removal need to be leveled with a small amount of solution. If you plan to lay tiles on the wall in the future, these small defects can be left, or the profile itself can remain on the surface; it will not interfere with the laying of the tiles.

In what cases should beacons be removed and why?

Experts in the field of construction and repair recommend removing beacons during the work process.

They are removed after completing the application of the solution, but not immediately. It is advisable to perform this procedure when the plaster has set slightly, but has not hardened.

Beacons located over the entire surface of the wall are removed mechanically. For this purpose the following can be used:

  • powerful magnets,
  • pliers,
  • durable scissors.

The main task in this case is to carefully remove the beacons from the entire surface of the wall.


Removing the beacon

Many people, when performing work, have a question about why these elements need to be removed at the final stage.

Most often, beacons are removed for the following reasons:

  • If metal elements are installed in the wall, there is a high risk of rust due to moisture penetration. Rust can protrude outward, which will significantly spoil the appearance of the wall decoration.
  • In some cases, beacons can move away from the walls after some time under the influence of external physical factors. Beacons installed in the wall, when they move away, form wide areas with cracks, which are quite difficult to repair.
  • When further repair work is carried out, there is a risk of hitting the metal strip. If the dowel collides with an obstacle, extensive cracks and chips may appear on the wall.


A solution is placed in the cavity from the lighthouse

To avoid these unpleasant factors, it is customary to remove beacons in advance after plastering and leveling the surfaces.

IMPORTANT: The only exceptions are gypsum beacons, as well as other types of guides in the case of using ceramic materials. In these options, the beacons can remain in the wall without harming the coating.

Installation of beacons for plastering walls in different ways

When installing, the main thing is to securely fix the beacon profiles to the wall. To reliably, quickly and accurately install the beacon on the wall, use ready-made or home-made fasteners, for example, eared ears, clips. Often the installation of beacons for plastering walls is done using mortar.

To prevent the solution on which the profiles were installed from serving as an accelerator for the crystallization of the plaster composition applied during plastering, the flashings are coated with a primer after installing the beacons.

Installation on plaster mortar or tile adhesive


Let's look at how beacons are placed, when they are installed and fixed using a plaster mixture.
If you install the profile directly on the screw caps, it may rotate during the fixation process, deviating from the correct position. Therefore, piles of plaster composition protruding above the caps are laid around the hardware with a spatula. Round or rectangular “bedside tables” are formed from the slides; the top is cut off along an auxiliary vertical plane at the height of the caps. On such hardened bedside tables, it is much easier to place beacons under the plaster and secure them with plaster mixture or tile adhesive.

After installing the plaster beacons on the marks, fix the position of the profiles between them. Pieces of cut drywall can be useful here, from which you can make a mark of the required height by gluing the pieces with a solution or adhesive mass. If the beacon profiles are located close to the surface of the base, it is enough to place a mortar mixture under them in the right places.

Installation of beacons without mortar

Since our task is the reliable installation of beacons with protection against displacement during the plastering process, we need quick, strong fastening of the profiles to the self-tapping screws. For this purpose, several types of fasteners have been invented.

You can install beacons on hardware using:

  • clips;
  • creamers;
  • eared;
  • cleverness;
  • homemade brackets made from straightened and cut beacon profiles.

The advantage of such fastening is the speed of installation, the absence of the need to wait for the plaster mixture to harden. In other words, it is enough to install the beacon profile and secure it with the fixing parts on the screws, and almost immediately after installation you can begin plastering. Beacon profiles installed on the walls will no longer move.

The disadvantage of such fastening compared to fastening to a plaster mixture is that it requires the installation of additional hardware, as well as the purchase of clamps.

Lighthouses from solution

You can make your own beacons for leveling walls using a plaster composition, for example, gypsum or cement. Such paths, made from the same plaster composition that will be used for subsequent plastering, do not need to be removed.

The easiest and fastest method is suggested by Andrey Shaiter.

To make guides from mortar, only a rule, a spatula and a trowel are used. The axes of the beacons are first marked on the wall, the zero point is found using a laser device, an auxiliary plane is set, and marks are made on the rule. Before starting work, prepare a viscous elastic solution.

Step-by-step production of a mortar beacon using the Scheiter method:

  • the rule is installed on the edge (fixed in this position on the scaffolding);
  • use a trowel to apply a solution to the upper edge of the rule;
  • apply the correct bar with the solution to the wall, pressing until the line on the rule and the laser beam are aligned;
  • using a rectangular trowel, adjust the angle of contact between the rule strip and the wall (to achieve the formation of a perpendicular);
  • use a spatula to remove excess mortar from both sides of the instrument;
  • using cotton threads, cut off the edge of the rule from the created mortar path, remove the rule;
  • Allow the solution to dry for a day, after which they lightly pass along the top of the beacon with a block of sandpaper.

This method creates mortar paths 2 cm wide. Made from gypsum, they dry out within a day and become suitable for plastering. During manufacturing, it is recommended to rest the lower end (heel) of the tool’s strip on a wooden wedge to avoid displacement of the strip when cutting with a thread.

Another method of making mortar guides and controlling their vertical level is somewhat more complicated.

  1. The rule bar is attached to the pre-installed screws to the wall (perpendicularly, on the edge).
  2. The gap between the plank and the wall is filled with mortar (without gaps).
  3. Use a spatula to remove excess plaster longitudinally from both sides.
  4. Gently tapping, shift the rule along the axis of the beacon, and then remove it from the formed path.

What materials and tools will be needed

To properly install beacon profiles, you will need:

  • Building level or plumb line. It can be bubble or laser. The tool is required to bring surfaces to a single level in a vertical or horizontal plane. Auxiliary materials are placed on the basis of the level.
  • Pencil for marking the installation of profile locations.
  • Scissors or a hacksaw for cutting profiles to length.

When attaching beacons with self-tapping screws, you will also need a screwdriver, a drill with drills and dowels.

If the profiles will be attached to the mortar, you will need gypsum-based glue, a container for its preparation and a spatula for applying the mortar.

Types of lighthouses

Auxiliary materials are used to determine landmarks to create a level surface. Their shape can be any. When plastering, various options for beacons are used (which one to choose is decided by the master):

  • Barriers made of mortar in the shape of a trapezoid or rectangle.
  • Stretched strings that rest on the mortar to provide even tension throughout the space.
  • Metal profile (L- or T-shaped).
  • Planed boards.
  • Plywood panels.

According to the material, they are metal, mortar, wood and plastic. Metal ones are easy to install and dismantle, but they can deform under load. This drawback can be eliminated by more frequent placement of mortar platforms. Typically T-shaped profiles are used. Their side shelves are used for fastening to the surface, and the edge determines the level of plaster application.

Note! When plastering large areas, metal pipes can be used. They have the required level of rigidity, but their cost is much higher than products made from analogue materials. In addition, in work it is possible to use only products with ideal geometry.

Increasingly, instead of metal devices, builders are using plastic ones. They are easier to install and are not subject to corrosion. The only drawback is brittleness at low temperatures.

How to install beacons?

Installation of beacons can occur using several technologies. There are many video master classes that explain how to install profiles. They often contradict themselves. Installation of beacons can be done in several stages.

From the very beginning, you need to carefully examine the surface of the walls along a vertical plane, using a level. It is necessary to mark the most noticeable deviations from the norm with a marker on the wall. Then, using a level, you should examine the wall along a horizontal plane. It is better to remove the most noticeable bulges (cut them off with a hammer drill).

Then you need to remove the markings for beacons

You need to start from the corners: it is important to move about 30 cm away from them (the minimum tolerance is 25 cm). Next, you need to make marks that are approximately 160 cm apart from each other, so that the rule can reach from one lighthouse to another

You cannot divide the wall into unequal parts. For example, if during marking approximately 2 meters of surface remains, it is better to set the profile at the 1 m mark.

After this, it is necessary to remove all dust and other contaminants from the wall, and then treat it with a deep penetration primer. These manipulations will help maintain the integrity of the wall, protecting it from fungus and mold. After waiting for the wall to dry completely, you should take a metal profile, attach it to the pre-designated line and screw a self-tapping screw into the upper part of the lighthouse. Then you need to attach a plumb line to the head of the screw, which will help you navigate the places where you need to make holes for other screws.

Only after obtaining an ideal result can you remove the plumb line. The same work must be done with other beacons.

It is important to secure the beacons with plaster in several places so that part of them is inside the layer of plaster. Then you should leave the structure for several hours so that it can dry

It is imperative to check the dryness of the plaster on the lighthouses, otherwise the integrity of the structure may be compromised. After this, you can begin plastering the wall.

Upon completion of these manipulations, you can leave the lighthouse profiles only if you subsequently plan to lay the wall with ceramic tiles. In all other cases, the beacons should be removed. Wallpaper or paint will not be able to hide the presence of beacons in the wall. Therefore, after completing the plastering process, it is better to dismantle the profiles. It is necessary to remove all the screws, remove the beacons from the walls, then seal the holes with plaster.

Types of lighthouses - what types of lighthouses there are

In this article we are looking at beacons for plastering walls, so there is only one main type of them, this is a metal galvanized beacon profile. There is also a homemade plaster beacon, which is made directly on the wall from plaster mortar, we will talk about it a little later. Another beacon on the outer corners of the walls can replace a metal perforated corner (you can immediately use a painting one) which is installed in any case, before or after leveling.

We will not consider any more species and fill our heads with them. There are many masters and craftsmen, everyone does as he wants and with what he wants. But I recommend not reinventing the wheel and plastering using standard galvanized plaster beacons. This is the answer to the question “which beacons are better?”

Preparing surfaces for leveling

The main methods of leveling and determining the curvature of a surface have already been described above, but preparation must be carried out before starting work.

The importance of preparatory work can hardly be overestimated - preparation has such a strong impact on the quality of the entire finishing complex. Work on leveling the walls begins with the removal of decorative finishing (wallpaper, cladding, layers of paint or whitewash). The freed surface is examined visually and using a simple instrument.

Detection of defects in the plaster layer.


Removing old coating

Having identified the nature of the deviations, they begin the initial correction. If the plaster coating is strong and has no defects, then excessively large protrusions or protrusions are cut down. If there are many defects and the coating is considered unsuitable, it is removed to the base.

Wall structures can be made of brick, monolithic or prefabricated reinforced concrete, wood, or made of stone or cellular concrete blocks. The type of wall material determines part of the preparatory work that increases adhesion strength. For example, stone or brick masonry requires jointing (0.5-1.0 cm deepening), concrete surfaces require notching to ensure strong adhesion of the mortar to smooth concrete.


Notching

Wooden surfaces are filled with shingles or wire mesh is attached. Measures to increase adhesion cannot be neglected, since plastering creates a coating that has a large dead weight.

Preparatory measures also include cleaning the base from stains of various kinds. Oil stains must be degreased. Rot, fungus, and mold are scraped out, washed and treated with an antibiotic agent.


Removing stains

Efflorescence, rust, and soot are removed in different ways. To prevent new rust from appearing, all unnecessary metal parts are removed from the wall, and the remaining ones are insulated, for example, with oil paint. To prevent efflorescence, high-quality waterproofing of walls is done.

During internal work, hidden wiring is de-energized. At the same time, sockets and switches are often replaced, that is, old covers are removed, the ends of the wires are insulated, and the boxes are sealed with masking tape while plastering. After all finishing work is completed, new electrical appliances are installed.

Cracks, chips and other defects in the foundation are repaired. The surface of the base is cleaned of dust. Apply a primer that matches both the wall material and the plaster mortar. Preparatory work also includes reinforcement and installation of beacons. The base must not only be cleaned, but also dried.


Sealing cracks

Preparatory work step by step:

  • removal of old coating;
  • cleaning the base;
  • repair of defects;
  • applying a primer;
  • drying;
  • reinforcement;
  • installation of beacons.

Option 3: rubbed plaster beacons

If there are minor irregularities on the walls that need to be covered with a layer of plaster, builders refuse to work with galvanized iron lighthouse profiles. Craftsmen prefer to install so-called rubbed plaster beacons. Manipulations require certain professional skills, the work time increases, but the result can please those who carry out construction or repairs themselves.


If you need to build intermediate elements, two identical tools are attached to the walls, acting as the basis for creating a polished beacon

Materials and tools

Having chosen this technology, you should find out how to properly carry out the installation, what tools and materials will be required when the use of this method is justified. First of all, you will have to take care of having the necessary tools. The master will need:

  • plumb line;
  • rule;
  • spatula;
  • screwdriver;
  • self-tapping screws;
  • screwdriver;
  • construction water level.

The prepared solution does not have a high level of strength, and the created structure will not be durable. It's better to prepare:

  1. Gypsum plaster (Rotband).
  2. Cold water.

When choosing a material intended to create a structure, it is important to remember that the dry mixture must contain gypsum. It is not allowed to use cement-sand mixture in the work.

The working process

The prepared, cleaned, primed wall is marked by marking on the surface the points into which self-tapping bolts will be screwed. It is to them that a plumb line is attached to determine the vertical line. It should be done at a distance of 5 cm on both sides of each inner corner.

You need to carefully select the rule used to create the rubbed beacon. Its size should not be 2-3 cm less than the height of the wall. The tool is fixed vertically using self-tapping screws, having previously drilled 3-5 holes in it, located at an equal distance. Further:

  1. Use a level to mark the vertical.
  2. Fix the rule strictly along the red line, retreating 5 cm from the corner.
  3. Prepare a composition based on a gypsum mixture, mixing the ingredients well.
  4. Fill the gap between the wide edge of the tool and the inner corner with the prepared solution.
  5. After smoothing the edges, wait until the solution hardens, remove the screws and carefully remove the profile.

A water or laser level will help you check the correctness and accuracy of the actions performed. The main advantage of this method is that there is no need to remove the landmark before applying the plaster mixture to level the walls.

It is almost impossible to make any surface level without installing beacons. Knowledge and ability to carry out high-quality and accurate markings, determine the zero and working planes, install galvanized iron profiles or create plaster beacons will help you achieve success in achieving your goal.

Before you start work, you should carefully study all the positive and negative qualities of a particular design, choose the one that will save money and avoid additional time costs.

Installation of beacons

After the primer has dried, you can install beacon strips. In most catalogs of building materials they can also be found as a beacon profile “PM 23x6”. “23” is the width of the base, “6” is the height of the lighthouse in mm. If you are plastering large protrusions, the beacon can be taken at 10 mm. The standard slats are 3 m high.

The beacon is installed in a vertical position. The rail is attached to the wall on alabaster, placing construction plaster at several vertical points for one lighthouse.

The placement of beacon slats begins with attaching two slats to the wall at opposite ends of one wall. For this:

  1. Mix a small amount of gypsum with water;
  2. We apply the mixture to the wall at several vertical points in the place where the beacon is supposed to be attached;
  3. We immediately attach the beacon to the alabaster.

The evenness of the beacons, their verticality and horizontality should be checked using a building level.

These works are carried out at a pace, but not in a hurry. If you do plastering yourself, without much experience in finishing work, you need to be especially careful.

So, you have secured two beacons at opposite ends of the wall. The attachment points from each other should be at a distance of no more than 50 cm. If you are installing the profile not on a brick, but, say, on a plasterboard, you can attach it using ordinary self-tapping screws, slightly pressing them so that the beacon does not bend. Between the two installed beacons, two parallel threads are stretched, at the top and bottom.

The remaining center beacons must be installed as follows: the top of each profile after installation should lightly touch the thread you pulled. The distance between the profiles is determined based on the parameters of the plastering tool that you are going to use. If you work as a rule with a length of 2 meters, then between the beacons there should be a space of 180 cm wide.

This completes the process of preparing for plastering.

Is it necessary to remove or remove beacons after plastering?

It is definitely necessary, even though they are galvanized. During the plastering process, galvanization is scratched and with exposure to moisture, the beacon will rust and the oxide will lick out through the wallpaper or paint, in the form of brown rusty stripes or spots. If the profile does not rust and the sellers convince you of this, then I will disappoint you - they oxidize and the gray oxide spots will still show through.

We dismantle the beacons using a hammer or hatchet, or you can simply pick it up with a spatula and pull it out along its entire length.

Therefore, we take out the beacons, do not reuse them, remove them and throw them away. I don’t think we are all so poor that we will skimp on lighthouses. It is allowed to leave profiles in places where there will be ceramic tiles or finishing stone, such as bathrooms, kitchen surfaces, floors or decorative parts of walls. In other cases we get it. It is advisable to remove beacons everywhere, because rust is unpredictable.

How to check the evenness of a leveled surface with a laser level

To check the evenness of the created plane, you need to place the laser level on a flat surface. After that, turn it on in the “vertical axis” mode. After this, the level is placed to the wall at 45 0. The laser will show the evenness of the surface. If there are errors, the beam will deviate.

Plastering a wall is an important stage in repair work and construction. After all, the appearance of the room depends on the flat surface. Irregularities in the wall after plastering are difficult to hide with putty or a finishing coat. Therefore, the plasterer’s work must be precise and correctly structured. To create a single plane, beacon profiles are used. Depending on the professionalism, various methods of attaching beacons to the wall are used. But all methods come down to one thing - evenness. Constant checking of the level and the rules will make the walls smooth, ready for subsequent finishing.

A little about the choice of material

Various types of plaster solutions are used to level the walls. Each of them has its own characteristics that must be taken into account when choosing it.

Type of plasterMain componentsAdvantagesFlaws
PlasterGypsum and limeEconomical consumption, easy application
Retains heat well

Used on a variety of substrates

Convenient for painting

Softness
Low resistance to damage

High moisture absorption capacity

Cement and
cement-lime
Cement, lime, sandEffective when decorating rooms with high humidity
High resistance to mechanical damage

Most effective under tiles and wallpaper

In dry rooms they quickly crack and crumble.
Responsive to temperature changes

Low resistance to damage

ClayClay, sandEnvironmentally friendly, rarely used
High breathability Creates a healthy indoor climate

Resistant to fungi and mold

Does not cause allergic reactions

Very heavy
Absorbs and retains odors, including unpleasant ones


Each leveling mixture has its own characteristics

Types of plaster beacons and beacon profiles

The following types of beacons for plaster are used in the work:

  • metal (stainless steel, aluminum);
  • plastic;
  • mortar;
  • wooden;
  • strings;
  • from plasterboard;
  • markers, etc.

Elements come in different configurations:

  • corner - used to align internal and external corners;
  • V-shaped - used as guides to create an even plaster coating.

Plastic ones are made from durable polymers and are stable after fixation. The mass of the elements is small, so the load on the supporting structures during operation is reduced, installation is carried out easily and quickly. The products are resistant to deformation. Plastic elements do not need to be removed from the hardened plaster surface after finishing is completed. However, it is necessary to take into account the instability of plastic elements to temperature changes.

Therefore, a variety of plastic beacons is used only for interior decoration. The elements are also not used for facade plastering due to their low resistance to mechanical damage. The plastic beacon must be installed correctly during plastering to prevent subsequent cracking of the decorative coating.

Metal beacons are distinguished by their strength, durability, and versatility in construction work. Beacons for plaster are presented in sizes 3-10 mm. When selecting beacons, deviations from the surface are taken into account. For large uneven areas, wide elements will be required. Beacons are made from steel or iron.

When installing, elements can be cut using pliers or metal scissors. To securely fix the elements, a solution or special fastenings are required. After completion of finishing work, metal elements must be removed from the wall to prevent rust. When purchasing beacons, the quality of the products is checked. There should be no deformation to create an uneven plaster coating.

Mortar elements are made from a composition that is subsequently used for plastering surfaces. The work is recommended to be carried out by experienced craftsmen, because... The accuracy of the placement and manufacture of elements is important. Mortar elements are suitable for leveling concrete or wooden floors.

The beacons do not need to be removed from the plaster coating; the protruding parts are cut off with a tool and sanded to create a uniform surface. Mortar elements are economical to use and are suitable for finishing rooms of different sizes.

Wooden beacons are produced in the form of slats. The advantage of the elements is the possibility of repeated use during plastering work. However, it must be taken into account that wooden planks are used only in rooms with dry air and are not suitable for finishing bathrooms, toilets, kitchens, or facade decoration.

Wire beacons are easy to manufacture, inexpensive, and produced using a solution. After leveling the base, the elements can be removed and the openings can be leveled with plaster mixture.

Gypsum beacons are used to level surfaces of small areas. Elements from the solution are used to create a layer of small thickness. Gypsum beacons are environmentally friendly, safe to use, and do not require removal from walls and ceilings after finishing work is completed.

Preparatory work for leveling walls

Before you start leveling the walls along the beacons using plaster, the working surface must be prepared.

First, wallpaper, tiles, paint and any other decorative coating are removed. If the walls are plastered, it is best to completely remove the old layer. In cases where it is not planned to remove all the plaster, it is necessary to identify and clean loose and swollen areas. After this, you need to clean the wall from dust and construction debris; for this you can use a broom or vacuum cleaner.

If the wall is severely damaged, there are deep depressions or, conversely, bumps in it, it is necessary to carry out rough leveling. To do this, you will need plaster to cover all the recesses, and a hammer to knock down the convex areas. Before applying a layer of plaster to the wall, the area is treated with a primer.

After rough leveling, the wall should be cleaned of dust again and then completely covered with a layer of primer. This is done in order to ensure better adhesion of the plaster to the wall surface and protect it from moisture.

The working process

After completing the preparatory work, you should place a level on a flat floor, mark the zero plane (along the line that the laser will show), and prepare metal beacons. The size of each of them corresponds to the height of the wall minus 10 cm. The distance from the floor is equal to the distance from the ceiling and will be 5 cm.

Further actions:

  1. Make a solution.
  2. Apply a certain amount of mixture to the wall at 5-6 points along the laser beam line.
  3. Carefully apply a metal beacon to the solution, pressing it lightly.

You can level a perforated profile without a laser level. It is enough to use a conventional device, applying it to the guide and pressing lightly. If necessary, the beacon is moved away from the wall and a solution is added under its flat (bottom) side. In a similar way, two landmarks are set. Between them you need to place intermediate beacons, determining the correct installation by a stretched cord, and monitoring the building level with a capsule filled with water.

The first guides should be mounted in the corners of the room, starting from the window. Be sure to check the correct installation using a plumb line. The distance to the intermediate beacon will be at least 60 cm, but most often experts set the next landmark, retreating from the first 1 m.

Installing guides not on a continuous strip of gypsum plaster, but on separate “cakes” of mortar makes it possible to reduce material consumption. It is necessary to control not only the quality and correct verticality of the enclosing structure. You also need to ensure that it is horizontal. To do this, you need to tighten the control cord connecting the middle of the corner supports.

It is possible to install beacons for plastering walls with your own hands without a laser. Construction is carried out using a corner that confirms the correct installation of fences on adjacent walls.

Preparatory work for installing beacons

Floor screed guides should be installed on the prepared surface. The performance characteristics and service life of the screed being performed depend on the correct execution of work to prepare the room for installation of guides. The strength of the poured base and its appearance are also determined by the quality of preparation of the floor surface.


Beacons for floor screed

Sequencing:

  • Remove skirting boards around the perimeter of the room.
  • Clean the old base from the worn coating.
  • Eliminate oil traces, greasy stains, and dirt on the surface.
  • Clean the base with a vacuum cleaner.
  • Sand protruding areas and local irregularities.
  • Seal deep cracks and cavities with the repair mixture.
  • Cover the surface with primer using a roller.
  • Place the waterproofing material on the dry base.

The most important task is to draw the “zero” line

All subsequent work will only gain some meaning if the zero level is very accurately determined, corresponding to both the horizontal and the required thickness of the future screed.

To work, you will need a water or laser level (the second, of course, is preferable - it will greatly facilitate the process).

Water level

You can, of course, use a building level, but in this case it must be quite long (1.5 - 2 m), very precisely calibrated, and the worker himself must have an excellent eye, since an error with this method is most likely.

Building traditional level

So, on the wall of the room, in the corner, which, according to a preliminary visual estimate, is located higher than the others, a mark is placed. Its height from the floor can be arbitrary, but it is better to choose, firstly, a multiple value, and secondly, such that it is more convenient to work - for example, 1.5 m.

Punching a reference horizontal line

  • With the help of the mentioned devices and tools, the level of this mark is transferred along all the walls, in order to connect the resulting marks with a solid straight line around the perimeter of the room. If everything is done correctly, then the line should close at one point, without the slightest difference in height. This reference line can be useful later not only for pouring the screed, but also for carrying out some other finishing work.
  • The distance from the reference line to the floor surface is carefully measured every 0.5 m. The obtained values ​​are recorded on paper or simply on the wall surface (if possible). Now, by simply comparing the results, the highest point of the floor along the perimeter of the room is determined - this is the place where the obtained value is the smallest.

In the example, there is a clear excess of 50 mm

  • If you have already decided on the minimum thickness of the future screed, then you can proceed to beating the so-called zero level. At the highest point, mark the required height from the existing base. Let, for example, it be 30 mm - this is the minimum thickness a concrete screed should have to ensure its strength and solidity.
  • Next, you can do two things. So, you can apply the method already described above and draw a zero line along the floor surface in the same way. This is not entirely convenient at such a height. Therefore, you can do it easier - measure the distance between the marked mark and the reference horizontal line. Then transfer this value strictly vertically at several points on the walls, so that the distance between the marks allows you to draw a line using an existing ruler. The resulting line, completely outlining the perimeter of the room, will be the zero level.
  • It’s too early to limit ourselves to this. In construction practice, it is rare, but still there are times when the floor level in the center of the room is slightly higher than near the walls. This is easy to check - you need to stretch the cord between opposite walls along the zero mark, and check the distance between it and the floor in the center of the room. This check is done in several places. If the distance between the cord and the surface is less than the required minimum thickness of the screed, then you will have to move the zero level up slightly - to the height required to ensure the required thickness.

If everything is normal, the zero-level tapping can be considered complete.

How to place beacons under plaster walls without a laser level

Beacons under plaster can be installed without a laser level using the following marking methods:

  • standard markup;
  • using the "spider" method.

The verticality of the elements is checked with a building level, ruler or plumb line.

Common markings when plastering walls

Beacons for plaster are installed using the standard method using nylon thread and a building level.

The work is carried out in compliance with the following stages:

  1. Markings are made with a distance of 10 cm from the corner of the room, and 15-20 cm from the ceilings. Self-tapping screws are installed at the marked points, protruding 3-5 cm above the surface
  2. A plumb line is tied to the screw, 2 new points are marked along the thread, into which the screws are screwed.
  3. When installing self-tapping screws step by step, the height of the element caps is checked. The surfaces of the screws must be placed in a single plane.
  4. The threads are pulled horizontally and vertically onto the self-tapping screws.
  5. The result should be a vertical plane.

Marking using the "spider" method

Before installing beacons for plastering walls, you can mark using the “spider” method using 4 stretched threads. The technique allows you to accurately calculate the thickness of the plaster coating and reduce the consumption of finishing material.

Marking stages:

  1. Taking into account a distance of 5-15 cm from the corners of the ceiling or wall, points for drilling holes for dowels are marked.
  2. Place 2 self-tapping screws into the prepared holes, protruding 5 cm from the surface.
  3. A nylon thread is tied to the screws.
  4. The accuracy of the marking is checked with a plumb line.
  5. After fixing the horizontal threads along the surface, the curvature, the maximum protruding point, is determined.
  6. Then the plaster coating layer is calculated.
  7. Intermediate beacon profiles are placed along the main beacons and extended threads.

Fastening beacons

Aligning the walls with beacons requires their correct installation; the final result will depend on this. Therefore, compliance with all stages and extreme composure will be required to avoid rework.

Fixing a metal profile-rail

Such strips can be installed in two ways, which are selected based on the specific situation.

Using dowels

Performed according to the following scheme:

  1. Marking is being done. The lines are drawn strictly vertically in increments of 80 to 100 cm. It must be taken into account that the first part will be located at a distance of 20 cm from the wall. To achieve the required evenness, a plumb line is used.
  2. Holes are drilled exactly along the lines. They are placed in increments of 30 centimeters. The minimum depth should be 8 millimeters.
  3. The dowels are driven in. If they are not there, then you can use a proven method - chopiki.
  4. A self-tapping screw is screwed into the dowel, having previously placed a “eared” fixing the slats on it.
  5. First, two profiles located at the edges of the wall are attached and aligned. A cord is stretched between them, along which the remaining elements are placed.

This option allows you to cladding walls along beacons with your own hands by adjusting the thickness of the plaster layer.

Application of gypsum mixture

How to set beacons using a solution? To do this, you will need a mixture of gypsum, cement and sand, metal slats, a level and a long, even lath. Installation technology: marking is carried out, as in the previous version, the required amount of solution is mixed, the mixture is applied pointwise along the entire length of the line and beacons are immediately installed. Each exhibited element is checked for level. Final fixation is achieved by laying another layer of mortar.

The process seems simple, but requires some experience.

Installation of beacons made of cement and plaster

This process will require more time. Fixation occurs according to the following algorithm:

  1. 30 cm are retreated from the ceiling, the same distance is measured from the wall. A nail is driven into the resulting point or a self-tapping screw is screwed in.
  2. A plumb line is lowered to the floor. Another screw is screwed in at a height of 20 cm from the floor.
  3. The procedure is repeated on the other side.
  4. A cord is pulled between the screws so that it does not come into contact with the surface. Several more screws are installed along the rope line.
  5. A solution is applied to each screw, a rule is placed between the top and bottom, and the space under it is filled with the mixture. This is done with all elements.

That is, you get even tubercles of plaster that will play the role of beacons.

How to place beacons on a wall under plaster

Such devices are necessary for leveling walls with unevenness, chips, and cracks. Before installation, the method of attaching the beacons, the type of profiles, and the frequency of placement of elements are selected. Before installing the beacons on the wall for plastering, the distance between the guides is determined.

The placement of beacons is carried out in accordance with the size of the surfaces being processed and the length of the rule. When applying the rule with dimensions up to 1.5 m, the pitch of the beacon strip is up to 1.3 m. The smallest gap in small areas for plastering is 0.8 m. The extreme guides can be placed from the internal corners at a distance of 10-30 cm. From window or When installing doorways, the beacon is placed at intervals of 0.1-0.15 m.

Installation of plaster beacons for leveling bases is carried out in compliance with the following steps:

  • surfaces are marked for leveling;
  • landmarks for the outer beacons are placed;
  • with a slight indentation from the leveled base using threads and cords, a vertical plane is created, accuracy is checked with a plumb line and level;
  • calculations of deviations on the plane are carried out;
  • distortions on the plane are corrected;
  • intermediate profiles are installed;
  • The mortar part for installing beacons is primed.

Leveling the wall surface

Depending on the type of binder material, it is customary to divide dry mixtures into:

  • gypsum;
  • cement.

The former are more suitable for residential premises due to the environmentally friendly surface obtained as a result and the property of maintaining a microclimate favorable for the residential area. Cement mixtures are more applicable in wet areas: kitchen, bathroom.

We prepare the plaster mixture in a bucket (capacity volume is about 12 liters) using a drill with a mixer attachment:

  1. The mixture must be poured into a container and diluted with water in the ratio recommended by the manufacturer of the material;
  2. Perform the first batch with a mixer;
  3. Let the mixture sit for a few minutes (usually 3-5 minutes);
  4. Carry out the second batch.

The mixture is considered ready if it looks uniform in color and composition.

Due to the short shelf life of the finished product, it is better to mix the plaster in batches.

Using a spatula, we begin to apply the mixture to the wall. It is better to apply the mixture from the container with a small spatula. A 10-15 cm tool is perfect for this.

The rule must be moved along adjacent beacon slats in a bottom-up motion. So we fill the entire space between adjacent beacons with plaster.

The plaster is applied using smooth movements with light pressure on the rule. You will determine the pressing force yourself by filling out the first section, or maybe even less.

Protruding tubercles and surface irregularities can be removed with a sharp spatula. The same action can be performed with sandpaper, but then the surface of the wall will become dusty.

Pay attention to the recommended application thickness of each layer (indicated on the material packaging). If necessary, plaster is applied in several layers

When applying the second layer, the plaster will fill in uneven spots and holes. Between layers, many craftsmen lay a layer of primer for better adhesion.

Having leveled one compartment, they begin to work with the second, keeping an eye on the level. Wet plaster may settle slightly at the base of the wall, causing folds of excess material to appear. In this case, they must be carefully removed with a spatula and the surface leveled again without applying a new mixture.

We have described the manual method. You can also level a wall with plaster by machine, when the mixture is applied to the wall not with a spatula, but from a special mixer with a sprayer (beacons are also used here). The plastering process is accelerated by 4-5 times.

For mechanized application, you will need to rent special equipment - a plaster mortar pump. We have already written about how to choose the right one on the pages of our blog.

How to correctly set the markings for installation

Marking the wall for installing beacons has certain nuances. It is necessary to draw up a diagram for attaching the beacons. They should not protrude beyond zero. Where the mount is supposed to be installed, vertical lines are first drawn. It is necessary to retreat 200 mm from the corner. Holes are drilled in all corners of the wall. Install the dowels, and then screw in the screws. It is important that when marking the wall, the heads of the screws do not protrude beyond the plane. Otherwise, the wall will be uneven. It is very convenient to control the process using a laser level. If it is not there, you can use the building rule and the liquid level.

When marking the wall, pay attention to the intermediate fasteners.

Plastering on beacons - simple and effective

The technique for plastering a wall surface depends on the characteristics of the solution used. The easiest way to work is with light and plastic gypsum mixtures; the most difficult thing to plaster is with self-prepared cement-sand mortars. But in general, the essence of the process is not particularly different.

It is necessary to densely fill the spaces between the beacons to level the walls with plaster mortar so that the layer protrudes above their backs and then remove the excess mixture as a rule, using the guide posts as a guide. The presence of installed beacons simplifies the work and makes it possible to form a flat vertical surface. In order for the plaster to turn out to be of high quality, you need to follow several rules:

  • if there are significant depressions relative to the plane indicated by the beacons, they are filled with the solution first and the entire surface begins to be plastered after the preliminary cape has set;
  • they begin to plaster from the bottom, choosing one of the niches between neighboring beacons, gradually filling it with mortar and forming a plaster layer to the top, only then moving to the neighboring area;
  • the plaster mortar is cut rigidly along the beacons, so that after plastering a certain area the backs of the racks are visible.

When the mortar on the plastered wall has set, the beacons are carefully removed, resulting in vertical grooves. They are sealed with the same solution, using the plastered surface as a guide for the leveling tool.

Lighthouses made of plasterboard

You can use strips of plasterboard for this purpose under plaster. It must be cut into pieces about 4 centimeters wide and attached to a concrete slab or brickwork. For these purposes, you can use special glue, or you can take a putty solution and add a little PVA glue to it.

All other stages are no different from installing metal beacons. This method has its disadvantages:

  1. You will have to spend a lot of time aligning the drywall strips evenly.
  2. There is no reliable and strong fixation, so the profiles are fixed movably, as a result the plaster layer may turn out to be uneven.
  3. You cannot install beacons so that there is no space between the wall and them.
  4. Great difficulties during dismantling.


Applying a thick layer of plaster

Process of applying the mixture

In most cases, to level walls with your own hands, it is recommended to use plaster gypsum mixtures.

This plaster solution has a large number of advantages:

  • This plaster has a high level of plasticity.
  • The layers of this mixture can be thick; the surface will not be covered with cracks upon completion of the repair.
  • Plaster with gypsum will provide a high level of sound and thermal insulation.
  • It will not have precipitation or lumps on the surface of the walls.

Holes and recesses in the wall must be sealed in advance with cement mortar and allowed to dry. Before starting plastering, you need to carefully stir the mixture using a hammer drill. Only after this can you begin to distribute the plaster over the surface. When applying the solution, it is better to use a wide spatula so that you can apply the plaster in a thick layer. It is necessary to level the layers of the plaster mixture from bottom to top, using the rule (a bar of smooth reinforcement). After leveling the plaster, it is better to remove the excess immediately so that it does not dry out and interfere with the finishing work.

Determination of material consumption

The consumption of the mixture when plastering walls with your own hands using beacons depends on the degree of curvature, vertical slope and the total area of ​​the surface being treated. Existing unevenness and blockage determine the average thickness of the plaster layer, which can be determined with sufficient accuracy after installing the outer beacons and cords stretched along them, forming the future plane of the plaster layer.


Pulling the cord.

At several points it is necessary to measure the distance from the cord to the wall. Add up all the obtained values ​​and divide by the number of measurement locations taken. This will determine the average thickness of the plaster. Multiplying the resulting number by the area of ​​the wall determines the required volume of solution.

The greater the number of measurements, the more accurate the result will be. In addition, horizontally stretched cords make it possible to determine the most protruding part of the wall and the place of the greatest thickness of the plaster layer.

After this, depending on the type of binder component, the required amount of material per cubic meter of solution is determined:

  • cement M400 – 230-250 kg;
  • slaked lime – 210-240 kg;
  • gypsum – 850-950 kg.

The ratio of binder material and filler is determined by the type of work operation (spray, primer, covering) during plastering:

  • cement-sand, lime-sand 1:2, 1:3 and 1:1.5, respectively;
  • lime-gypsum-sand 1:1:2;
  • gypsum-sand-clay 0.25:3:1;
  • lime-clay-sand 0.2:1:3.

Ready-made dry plaster mixtures, which are sold in building materials stores, are always accompanied by a consumption inscription written on the packaging. All you have to do is multiply this number by the thickness of the plaster layer in centimeters and the area of ​​the wall. After this, you can find out the required amount of material.

Rating
( 1 rating, average 4 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]